Vol. 4 No. 2 (2024): Jurnal Inovasi Pertambangan dan Lingkungan

Published: 2025-02-26

Articles

  • PERENCANAAN TEKNIS PENANGANAN LUMPUR DARI SUMP PIT SELATAN MENUJU DISPOSAL DI PT CARITAS ENERGI INDONESIA SITE PT BJL

    Tommi Mandala Putra, Yudi Arista Yulanda, Muhammad Ikrar Lagowa
    55-63
    DOI: https://doi.org/10.15408/jipl.v4i2.42559
    Abstract View: 155 PDF Download: 114
  • ANALISIS KESTABILAN LERENG HIGHWALL PADA RENCANA PENAMBANGAN TAHUN 2024 DI PIT RAJAWALI DI PT TRIARYANI

    Dzaky Alfaiz Halza, Alio Jasipto, M. Akbari Danasla
    64-70
    DOI: https://doi.org/10.15408/jipl.v4i2.44563
    Abstract View: 116 PDF Download: 83
  • PENGELOLAAN AIR ASAM TAMBANG (ACID MINE DRAINAGE), MENJADI SUMBER AIR BERSIH DI PT. BUKIT ASAM TBK (STUDI KASUS IUP BANKO BARAT)

    Avellyn Shinthya Sari, Yudho Dwi Galih Cahyono, Angga Pratama Putra Kobba
    71-77
    DOI: https://doi.org/10.15408/jipl.v4i2.42497
    Abstract View: 689 PDF Download: 331
  • EVALUASI METODE PENGOLAHAN PASIF UNTUK MENURUNKAN pH DAN KANDUNGAN LOGAM TERLARUT PADA AIR ASAM TAMBANG

    Deksarina Deksarina, Dyah Tjahyandari Suryaningtyas
    78-90
    DOI: https://doi.org/10.15408/jipl.v4i2.44311
    Abstract View: 236 Untitled Download: 23
  • DESAIN ULANG GEOMETRI PELEDAKAN UNTUK MEMENUHI TARGET PRODUKSI, FRAGMENTASI, SERTA PREDIKSI GETARAN DAN FLYROCK MENGGUNAKAN SOFTWARE DI PT PEBANA ADI SARANA

    Anindya Triana Salsabila Surya, Alio Jasipto, M. Akbari Danasla
    91-102
    DOI: https://doi.org/10.15408/jipl.v4i2.44502
    Abstract View: 111 PDF Download: 192