VALUE ENGINEERING APPLICATION FOR ELEMENT ANALYSIS OF HEAVY EQUIPMENT EVACUATION TO GET HIGHER ACTIVITY VALUE

Mulyanto Soerjodibroto, Nadila Guspani Putri

Abstract


The safety of workers and equipment from the dangers of flyrock blasting is an absolute must. The purpose of this safeguard is in line with the K3 and K Operational Mining principles as emphasized in the Good Mining Practice guidelines. It is undeniable that in order to meet these safety requirements, it is necessary to sacrifice costs as well as loss of equipment production  hours. With reference to the principles of Value Engineering Analysis, research was carried out in an effort to reduce these sacrifices by reducing the farthest flyrock ejection distance of  bench overburden blasting  at PT. Antareja Mahada Makmur site in East Kalimantan  without violating the safety requirements as meant in the Minister of ESDM Decree no. 1827/2018 Attachment 2 page 79 points (ix).

The research was carried out by modifying the parameters of the detonation ladder, especially those related to the explosives factor, to obtain safe distance from the farthest ejection of flyrock which is smaller than the 300 meter requirement. From the experimental series, it was obtained that the safe distance from the farthest ejection of flyrock is  150 meters as a reference for heavy equipment evacuation. This brings benefits to the company in the form of reducing sacrifices up to ± 50% from the previous without reducing the required Safety Value.

 

Keywords : Flyrock , Safe distance , Value Engineering.


Full Text:

PDF

References


Ash, R.L. (1963). The Mechanics of Rock Breakage (Part 2) - Standarts for Blasting Design. Pit & Quarry Magazine.

Bhandari, S. (1997). Engineering Rock Blasting Operations. Balkema. Rotterdam.

Crum, L. W., DFC, CEng, FRAes, Value engineering: The Organised Search for Value, 1971.

Guspani Putri, Nadila, Analisis flyrock untuk mengurangi jarak aman minimum alat pada operasi peledakan overburden PT. Antareja Mahada Makmur Site PT. Multi Harapan Utama Kalimantan Timur, Tugas Akhir Teknik Pertambangan UIN Jakarta.

Ghasemi, E., Sari, M., & Ataei, M. (2012). Development Of An Empirical Model For Predicting The Effects Of Controllable Blasting Parameters On Flyrock Distance In Surface Mines. International Journal of Rock Mechanics and Mining Sciences, Vol.52 : 163–170.

Hustrulid, William. (1999). Blasting Principles for Open Pit Mining Vol 1 :General Design Concept. A. A. Balkema. Rotterdam.

Keputusan Menteri ESDM Nomor 1827 Tahun 2018 tentang Pedoman Pelaksanaan Kaidah Teknik Pertambangan yang Baik.

Konya, CJ. (1995). Blast Design, Precision Blasting Services. Montville.

Miles, L.D., Techniques Of Value Analysis And Engineering, Mcgraw-Hill, 1972

Sharma, A. and Belokar, R. M., Achieving Success through Value Engineering: A Case Study, Proceedings of the World Congress on Engineering and Computer Science 2012 Vol II, accessed 27 December 2021

Stevens, L. N. (1992), Value Engineering: Usefulness Well Established When Applied Appropriately, Testimony before the Subcommittee on Legislation and National Security of the Committee on Government Operations of the House of Representatives, 23 June 1992, accessed 24 August 2021.

Value Engineering, Department Of Defense Office Of The Assistant Secretary Of Defense (Acquisition And Logistics), March 1986




DOI: https://doi.org/10.15408/jipl.v3i2.29412 Abstract - 0 PDF - 0

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Mulyanto Soerjodibroto

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Publisher Mining Engineering Department, Faculty Science and Technology, Syarif Hidayatullah Jakarta State Islamic University,
 
Jl. Ir. H. Juanda No. 95, Ciputat, Jakarta 15412, Indonesia, Telp. 021-7492855, Fax. 021-7493351, website: http://journal.uinjkt.ac.id/index.php/jipl, e-mail: jipl.journal@uinjkt.ac.id